TABLE 2. Pumping costs and data for irrigation wells, Portales Valley,
         Roosevelt County, 2001.
=================================================================================
INPUT DATA
----- ----
                                    DEPTH CHARACTERISTICS:
                                             STATIC............      80
                                             DRAW DOWN.........      20
                                                TOTAL HEAD.....     100
                                             CASING............     120
GALLONS PER MINUTE (GPM)...     400
WORK HORSEPOWER............      10
 
EFFICIENCY FACTOR:
 
      ELECTRICITY..........   0.430
      NATURAL GAS..........   0.126
      LP GAS...............   0.126
      DIESEL...............   0.130
 
FUEL COST PER HOUR:
      ELECTRICITY..........   $7.72   CENTS/KwHr
      NATURAL GAS..........   $3.71   $/MCF
      LP GAS...............   $0.98   $/GAL
      DIESEL...............   $1.40   $/GAL
 
PUMPING COSTS
------- -----
 
ELECTRIC WELL:
         COST PER HOUR.............$   $1.38
         COST PER ACRE INCH........$   $1.57
 
NATURAL GAS WELL:
         COST PER HOUR.............$   $0.86
         COST PER ACRE INCH........$   $0.97
 
LP GAS WELL:
         COST PER HOUR.............$   $2.20
         COST PER ACRE INCH........$   $2.49
 
DIESEL WELL:
         COST PER HOUR.............$   $1.98
         COST PER ACRE INCH........$   $2.24
=================================================================================